Skip to main content

Image Technical Structure

TECHNICAL EQUIPMENT DISTRIBUTED IN 16 ROOMS AND 4 FLOORS

  • 6 Flame 4K
  • 2 Flare
  • 3 Flame Assist
  • 2 Smoke
  • 2 NukeX
  • 2 Unreal Engine
  • 4 After Effects, Cinema 4D
  • 1 CGI Light and Rendering
  • 1 CGI Pre-composition
  • 2 Final Cut & Adobe Premier
  • 1 Film Scanner 2K RT
  • 2 Color grading 4K
  • 2 Graphics 5K
  • 3 Cloud System, DAM + Traffic Room & QC & Trascoding

Sound Technical Structure

Sound building distributed in 4 studios

  • 4 Pro Tools Ultimate 2022 with MTRX and MacStudio Ultra
  • 3 Light Room acustic issolated
  • 3 Manley tube microphones & previous
  • 1 Studio Mixing 5.1
  • 3 IP Codex Session Link Pro
  • 4 4 Nexus Pro, Altiverb 7XL, Izotope RX9, Fab Filter, Waves, SurCode Dolby, etc.
  • 3 Home assistance PT studios
  • 3 Remote conectivity HD Audiovideo conferencig and far-end recording Protools based on IP codecs, SessionLink Pro recording and conference and 2 Source-Connect Pro